Comparing Purpose-Built EAM/CMMS and ERP Maintenance Modules

Compare the work each option requires from your organization: configuration, operating procedures, assurance, interfaces, training, and ongoing changes. Test the proposed configuration against the work your team intends to perform.

This article gives Quality, IT, and asset teams a common way to examine those responsibilities. Document the same test cases for each candidate.

TL;DR: You’ll Take Away

  • A common set of workflow demonstrations for each candidate.
  • Questions about supplier evidence, mobile work, interfaces, and ongoing responsibilities.
  • A lifecycle-cost comparison built from your own scope and assumptions.

How to read this article: The comparison questions are practical evaluation tools. Product capabilities require evidence for the proposed version and configuration; category labels and demonstrations alone do not establish compliant operation.

Jump to Section

Compare the Assurance Work for Your Intended Use

Request the supplier’s available evidence and map it to the system you intend to use. Identify the proposed configuration, interfaces, procedures, and remaining verification. Ask who prepares each item and who approves its adequacy.

Supplier documentation supports your assurance work. It does not transfer accountability for fitness for intended use away from the regulated firm.

Turn Purpose-Built Into Questions You Can Test

When a supplier describes a product as purpose-built, ask what that means in the proposed configuration. Which work-order fields, calibration workflows, review steps, and record-history functions are already available? Which require configuration? Which need an interface or additional development?

Record the answer with the version and configuration demonstrated. Treat demonstrated, configuration-dependent, and unresolved as evidence states. Attach each result to the specific product, configuration, and intended use.

From Assurance to Operational Use

Plan how the approved system will enter ordinary use. Confirm asset data, work instructions, user responsibilities, training, and record-retention arrangements. Ask which dependencies could delay the transition and who owns them.

A useful demonstration follows a representative asset from setup through scheduled work, execution, review, and retrieval. Document what the example actually proves. Use that evidence to identify the work still needed before rollout.

Evaluate Mobile and Offline Execution

Where offline work forms part of your intended use, include it in the evaluation. Follow a test record through capture, correction, reconnection, and any conflict resolution. Examine identity, timing, record history, and signature linkage where signatures are used.

For records in Part 11 scope, evaluate the relevant controls against §§11.10(e), 11.50, and 11.70. Record the mobile behavior shown in the proposed configuration.

Follow a Change Through the Approved Process

Ask the supplier to demonstrate the review rules your organization intends to use. Examine a proposed schedule change, a controlled workflow change, or a parts-substitution case relevant to your process. Determine who authorizes it and what evidence remains.

For EU GMP computerized systems, Annex 11 §10 addresses change and configuration management, and §11 periodic evaluation. The product demonstration should support the process you have defined.

Connect Maintenance and Calibration Decisions

Examine how maintenance and calibration information relates to the same asset. Can the team distinguish the recorded result, equipment status, outstanding work, and decision about use? If records reside in separate systems, demonstrate how their relationship is maintained.

Define how the approved process handles maintenance work, calibration status, and any restrictions on equipment use. Use ICH Q9(R1) to frame the risk-based assessment.

Evaluate the Interface and Its Responsibilities

Identify the purpose of each connection and the system that owns each record. Ask how a rejected, delayed, or conflicting update is recognized and resolved. Record the supplier’s support responsibilities and your organization’s remaining work.

Part 11 §11.10(e) specifies audit-trail controls for records in scope. EU Annex 11 §9 addresses audit trails of GMP-relevant changes and deletions on a risk basis. Applied to an interface, the relevant record history must remain accountable across the handoff. Evaluate the proposed connector against the record and its intended use.

A standard connector still needs evaluation for its intended use and configuration. Assign the configuration, verification, and support work for each interface.

Build a Lifecycle Comparison From Local Evidence

Use the same scope for every option. Document implementation, asset-data work, configuration, interfaces, assurance, training, support, upgrades, and any planned expansion. Distinguish a supplier commitment from an estimate or unresolved dependency.

Cost AreaQuestion to Resolve
ImplementationWhat work is included, and what remains with your team?
AssuranceWhich evidence is supplied, and what remains to be assessed or produced?
InterfacesWhat must be configured, tested, supported, and changed over time?
Ongoing useWho maintains procedures, training, permissions, and master data?
Releases and expansionWhat responsibilities repeat, and which assumptions need rechecking?

Use measured local costs where available. Where you estimate, record the owner and test how the estimate changes the decision. Make the assumptions and remaining work visible before choosing.

Choose on the Evidence You Can Review

Bring the demonstrated workflows, remaining work, responsibilities, and cost assumptions into one decision. Ask what would need to be true for each option to meet your intended use. Keep unresolved questions visible until the accountable owner answers them.