A preventive maintenance (PM) work order closes on time. Along the way, the technician finds a problem and makes a repair. If that repair disappears inside the completed work order, what does your maintenance dashboard actually tell you?
In a good manufacturing practice (GMP) plant, that record also has to hold up during an inspection. Hidden corrective work weakens the history you use to evaluate PM intervals, investigate recurring failures, and plan predictive maintenance.
In this CMMSradio conversation, Blue Mountain’s Chris Tencza, Director, Advanced Services, joins host and CMMS consultant Greg Christensen. Recorded at a Society for Maintenance & Reliability Professionals (SMRP) annual conference, their discussion starts with the work behind the numbers.
The practical question for your computerized maintenance management system (CMMS): Can its records distinguish planned work, findings, and corrective responses?
Chris describes repairs happening during scheduled PMs without a clear distinction between the planned task and the corrective work. A completion report can then conceal the recurring faults keeping technicians busy.
His oil example makes the problem concrete. A technician keeps topping up oil during a PM. The repeated need for oil should prompt another question: Where is it going?
Record the finding where your reports can retrieve it. Link the corrective work order to the originating PM, and apply the relevant failure code when the event meets your site’s definition. If your work-execution procedure doesn’t specify how to capture and link that work, start there.
Keep observations, planned replacements, and confirmed failures distinguishable. Reliability engineers need consistent failure definitions and operating-time data to calculate mean time between failures (MTBF). Clear classifications also help them investigate recurring failure modes.
That distinction matters when you review the schedule. A low corrective-work count cannot support a longer PM interval if repairs routinely disappear into PM activity.
Chris discusses using corrective-work history and equipment runtime to evaluate PM effectiveness. Bring those records together with the task’s purpose, operating conditions, manufacturer guidance, and relevant failure modes. Consider calendar-dependent needs as well as runtime.
For drug manufacturers, 21 CFR 211.67(a) requires maintenance at appropriate intervals to prevent malfunctions or contamination that could compromise drug quality. Document how the available evidence supports your interval, and identify any gaps that limit the decision.
Medical device manufacturers subject to the Quality Management System Regulation (QMSR) should assess their maintenance program against its incorporated ISO 13485:2016 requirements.
Route proposed interval changes through the site’s applicable risk assessment, approval, and change-control processes. Idle equipment alone doesn’t establish that a task can be deferred.
Incomplete work history carries the same problem into predictive maintenance. Chris describes teams eager to expand their capabilities while basic recording practices still need attention.
Artificial intelligence (AI) analysis of maintenance records inherits gaps in those records. If a repair is absent from the data supplied to a model, that repair’s timing, cause, and outcome are unavailable as recorded evidence.
Sensor readings and other inputs may provide additional signals. They still need interpretation alongside the equipment’s work history. Treat an AI-generated pattern as something to investigate against source records and operating context.
Chris emphasizes that people must evaluate the information they collect. Use the review below to check the history your team will rely on before extending its analysis.
Prioritize the review where poor information could lead to the most consequential decision. Chris’s hypothetical backup generator illustrates why: One failure during a power outage could affect several bioreactors and the batches they support.
Use your site’s criticality assessment to identify those dependencies, including supporting utilities and available redundancy. Consider effects on product, delivery, and patients alongside the repair itself.
Choose one high-criticality asset and bring the people responsible for its work, reliability analysis, and quality oversight into the review.
Put Your Records to the Test
Start with the last 12 months of PMs and linked corrective work for the asset. Adjust the window if its operating cycles or available history require a different view, and record that choice.
Use these Pass/Fail checks to diagnose the workflow. A pass applies to the records reviewed; it is not a certification of the entire maintenance program.
Trace the planned task, technician findings, and additional work.
You can distinguish all three and connect them to the asset and work event.
The completion record leaves additional work or the reason for it unclear.
Run the relevant report or filter, then compare the result with a sample of the underlying work records.
Findings requiring follow-up and their corrective responses are retrievable and linked, including any still awaiting action.
You must read technician comments to discover corrective work that the report does not identify.
Follow repeated observations, adjustments, and repairs across the review window.
Consistent asset identifiers and classifications let you trace repeat events and the response to them.
Inconsistent identifiers or labels prevent you from determining whether the same problem keeps returning.
Trace the review and disposition of findings, including unresolved items.
An unresolved finding has an identifiable owner, documented review, and next action; a closed item has a supported disposition.
A finding disappears when the PM closes, or you cannot establish who owns the follow-up.
Use the results to improve the workflow and future records. Handle corrections to existing records through your approved process, preserving their history.
For a closer look at retrieving and explaining the evidence, see Audit-Ready EAM/CMMS Records.
If the review turns up gaps your current system can’t close, The GMP Playbook for EAM/CMMS covers what to require and how to test it in a vendor demonstration.